top of page

East Ham Town Hall Annex

Project Description:

 

The Town Hall Annex was built in the early 1930’s and has been used as offices for Newham Council until 2019. Following relocation, the borough has decided to carry out a full refurbishment and convert the building from office space to 40 residential apartments. This will be achieved by carrying out a complete strip out and refurbishment of the main building while retaining many of the original features, removal of old low level ancillary buildings and the addition of a two storey roof top extension.

In addition to the internal work the design team were tasked with refurbishing the external façade which included repairing many of the original Art Deco features to return the building to its former glory.

                                                                                                             

Key Challenges:

  • Working on a listed building 

  • Asbestos investigation and removal

  • Extensive intrusive structural investigation works

  • Imposed loads onto the existing structure

 

Should you wish to know more about our role on Residential projects, please contact hello@iM2ltd.com

iM2 Role: Principal Designer

Project Team:

DRMM Architects

Tulley De’ath

Synergy

Gillespies

Sector: Residential

Start Date: July 2019

Completion: April 2020

Value: (£) 11M

Screenshot 2021-06-28 at 16.20.58.png
Screenshot 2021-06-28 at 16.21.14.png
Screenshot 2021-06-28 at 16.21.07.png
APS-logo White.jpg
iirsm_main_logo.jpg
iM2 Limited
Hamilton House
Mabledon Place
London, WC1H 9BB
England, UK
  • X
  • LinkedIn

www.iM2ltd.com

0203 972 4157

CIOB-Logo.jpg
IOSH-Logo.jpg
iM2 LOGO ISSUE A OUTLINES 25-05-20.png
bottom of page